Lifting for the Power & Renewables sector

Power & Renewables

Autovictor has always powered progress and is the ideal partner for energy infrastructure projects, helping to deliver the energy that drives the world. Autovictor's commitment to the electrical and renewable energy sectors spans several decades and is demonstrated by numerous successful projects involving power plants and wind farms, both nationally and internationally, including the transportation and final installation of generators, turbines, and transformers.


Transformer Installation


Transformers are high-value assets that require rapid and safe handling. In this field, Autovictor relies on a dedicated engineering department specializing in the transportation and installation of these critical components.

A thorough assessment of the infrastructure along the transportation route is carried out to safely identify and overcome any potential obstacles. Once on site or within the installation area, Autovictor's mobile cranes are prepared for the final lifting operation following a detailed analysis of ground bearing capacity and existing infrastructure, where working spaces are often limited. For on-site handling operations, Autovictor employs self-propelled modular transporters (SPMTs) with load capacities of up to 48 ton per axle. Technical drawings are prepared in AutoCAD for every project to ensure maximum safety throughout all operational phases.


Turbine and Generator Installation


The transportation and installation of turbines and generators require advanced logistical planning to ensure safety, schedule compliance, and cost optimization.

As part of the planning and methodological management of operations, Autovictor identifies the most suitable transportation route by assessing the need for structural reinforcements, obstacle removal, and the construction of temporary infrastructure when necessary.

Autovictor relies on specialized equipment for on-site transportation, including modular trailers and SPMTs, ensuring maximum safety and positioning accuracy.

For final installation activities, Autovictor operates a fleet of high-quality cranes and mobile cranes with substantial lifting capacities, specifically designed for the precise placement of turbines and generators.


Wind Energy Installation


The installation of onshore wind turbines represents a significant engineering challenge, requiring optimized solutions to reduce assembly times and improve the economic sustainability of the project.

Through its in-house engineering department, Autovictor carefully evaluates ground conditions, gradients, and available manoeuvring areas to develop safe and efficient lifting plans.

When selecting lifting equipment, Autovictor primarily deploys high-capacity all-terrain mobile cranes, which provide outstanding mobility and operational flexibility, together with the ability to perform lifts at considerable heights and radii for the installation of wind turbine towers, nacelles, and blades.

This operational efficiency significantly reduces crane dismantling, relocation, and reassembly times between successive installations, thereby improving overall project productivity.

Download PDF
  • Lifting for the Power & Renewables sector - 1
  • Lifting for the Power & Renewables sector - 2
  • Lifting for the Power & Renewables sector - 3
  • Lifting for the Power & Renewables sector - 4
  • Lifting for the Power & Renewables sector - 5
follow us on Facebook Instagram YouTube LinkedIn
VAT No. 00506710037 | Privacy Policy | Cookie Policy | Whistleblowing
Intermedia